Concrete Estimating & Bidding Software

Concrete estimating starts with volume but rarely ends there. Forming and finishing routinely carry more labor than the pour itself, and placement method can change the number substantially. Pro Spec IQ separates volume, forming, and finish so the labor is visible rather than buried in a yard price.

What Pro Spec IQ tracks on a concrete bid

Beyond material, labor, and equipment, concrete bids get inputs specific to the trade:

Cubic Yards

cu yd

Total cubic yards of concrete

Slab Square Footage

sq ft

Total slab area in square feet

Rebar (tons)

tons

Tons of rebar reinforcement

Formwork Linear Ft

linear ft

Linear feet of formwork needed

Pump Truck Hours

hrs

Hours of concrete pump truck rental

Starting markups for concrete

10%

Overhead

15%

Profit

8%

Contingency

These are editable defaults, not fixed rates. Set them per bid to match your own cost structure and the risk on the job.

What drives cost on concrete work

  • Cubic yards of concrete, including waste allowance
  • Form square footage and whether forms are reusable on the job
  • Finish type — broom, trowel, exposed aggregate, and stamped are very different labor
  • Reinforcement: rebar tonnage or mesh area, plus tie labor
  • Placement method, since pump time and truck access can dominate a small pour

Where these estimates go wrong

  • Quoting from a per-yard price that silently assumes an easy pour and simple finish
  • Underestimating form labor on anything other than a flat slab
  • Missing pump cost on jobs where the truck can't reach the placement
  • Not pricing weather protection on cold or hot weather pours

Concrete estimating questions

How do you estimate concrete work?

Calculate volume in cubic yards with a waste allowance, then price forming by square foot and reinforcement by weight or area. Add finish labor by type, placement and pump cost, then apply overhead, profit, and contingency. Pro Spec IQ tracks yards, form area, and rebar as separate inputs.

How much waste should I include on a concrete order?

Waste allowance depends on the pour type, form accuracy, and site conditions, so it's a judgment call rather than a fixed figure. Pro Spec IQ exposes it as an input on the bid so it's an explicit decision instead of something absorbed into the yard price.

What defaults does the concrete estimator use?

Concrete bids start at 12% overhead, 15% profit, and 7% contingency — the higher contingency reflecting weather and subgrade risk. All are editable.

Build your next concrete bid in Pro Spec IQ