Framing bids are labor-dominant and lumber-volatile. The crew hours are reasonably predictable from square footage and complexity; the material cost can move between bid and build. Pro Spec IQ keeps material and labor separate so a lumber swing doesn't hide what's happening to your labor margin.

What Pro Spec IQ tracks on a framing bid

Beyond material, labor, and equipment, framing bids get inputs specific to the trade:

Board Feet (lumber)

bd ft

Total board feet of lumber

Wall Linear Feet

linear ft

Total linear feet of wall framing

Trusses

trusses

Number of trusses to set

Sheathing Sheets

sheets

Number of sheathing sheets (4x8)

Headers / Beams

headers

Number of headers and beams to install

Starting markups for framing

10%

Overhead

15%

Profit

5%

Contingency

These are editable defaults, not fixed rates. Set them per bid to match your own cost structure and the risk on the job.

What drives cost on framing work

  • Framed square footage and number of stories
  • Lumber package cost, which can move significantly between bid and purchase
  • Crew size and duration, the dominant labor variable
  • Complexity — roof geometry, tall walls, and cut-up floor plans add hours faster than area
  • Sheathing and fastener quantities, which scale with wall and roof area

Where these estimates go wrong

  • Holding a lumber price too long on a bid that won't be built for months
  • Estimating from square footage alone on a plan with complex roof framing
  • Missing crane or lift time on tall wall panels
  • Not separating material from labor, which hides where margin is actually going

Framing estimating questions

How do you estimate framing?

Take off the lumber package from the plans, then estimate crew hours from framed area adjusted for complexity. Price sheathing and fasteners by area, add equipment, then apply overhead, profit, and contingency. Pro Spec IQ tracks square footage, crew size, and material cost as separate inputs.

How do I protect a framing bid against lumber price changes?

Common approaches are a bid expiration date, a stated material escalation clause, or a contingency sized to the exposure. Pro Spec IQ puts an expiration date and a contingency percentage on every bid, so both are available without a workaround.

Can I track the job after the bid is accepted?

Yes. An accepted bid converts to a job with daily logs, change orders, and budget-versus-actual tracking, so the estimate and the build stay connected.