Masonry Estimating & Bidding Software

Masonry is unit-count work with heavy labor and real access cost. Brick and block quantities follow from wall area, but scaffolding, lift equipment, and weather protection can carry a significant share of the bid. Pro Spec IQ tracks units and access separately so neither disappears into a blended rate.

What Pro Spec IQ tracks on a masonry bid

Beyond material, labor, and equipment, masonry bids get inputs specific to the trade:

Block / Brick Count

blocks

Total blocks or bricks needed

Wall Sq Ft

sq ft

Total masonry wall area

Mortar Bags

bags

Number of mortar bags needed

Scaffold Rental Days

days

Days of scaffold rental

Starting markups for masonry

10%

Overhead

15%

Profit

5%

Contingency

These are editable defaults, not fixed rates. Set them per bid to match your own cost structure and the risk on the job.

What drives cost on masonry work

  • Unit count derived from wall area and the unit size in use
  • Mortar volume and mix type
  • Wall height, which drives scaffolding and lift requirements
  • Reinforcement, ties, and any grouted cells
  • Cleaning, sealing, and weather protection

Where these estimates go wrong

  • Estimating units without accounting for openings and returns
  • Omitting scaffolding cost and erection labor on tall walls
  • Underpricing cleanup and sealing at the end of the job
  • Not pricing cold-weather protection on late-season work

Masonry estimating questions

How do you estimate masonry work?

Calculate wall area net of openings, convert to unit count, and price units and mortar from there. Add scaffolding, reinforcement, and cleaning, apply labor hours at your rate, then layer overhead, profit, and contingency. Pro Spec IQ tracks unit count and wall area as explicit inputs.

Should scaffolding be its own line on a masonry bid?

Keeping it separate is generally clearer, since it's driven by height and duration rather than by unit count. It also makes the number easier to defend if the schedule changes and the scaffold stays up longer.

What defaults does the masonry estimator use?

Masonry bids start at 12% overhead, 15% profit, and 7% contingency, all editable per bid.

Build your next masonry bid in Pro Spec IQ

Seven-day free trial. No charge until the trial ends, and no per-seat fees.

Get started